CCTV camera cable utp FTP cat5e cable with messenger and power cable


Specification:
Application & Certificates:


Q6.IS IT OK TO PRINT MY LOGO ON CABLES ?


Specification:
Construction Parameters: | ||
Video and Control Pairs | ||
Inner Conductor | Solid Bare Copper | |
Diameter | 0.50mm/24AWG | |
Insulation Material | 0.90mm HDPE | |
Number of Conductors | 8(4 Pairs) | |
Drain wire | 24AWG TC | |
Shield | PET / AL-Foil | |
Power Conductors | ||
Inner Conductor | Stranded Copper | |
Diameter | 0.75mm2 | |
Insulation Material | 2.50mm HDPE | |
Number of Conductors | 2 | |
Shield | None | |
Messenger | Zinned Steel | |
Electrical Characteristics: | ||
Video and Control Pairs | ||
Temperature Rating | -40ºC to 70ºC | |
Operating Voltage | 300 V RMS | |
Max.Capacitance @1 KHz | 45.9 pf/100m | |
Nom.Impedance | 100 Ohms | |
Nom.Velocity of Propagation | 66% | |
DC Resistance per Cond. | 26 Ohms/1M' Nom @ 20ºC | |
Power Conductors | ||
Temperature Rating | -40ºC to 70ºC | |
Operating Voltage | 300 V RMS | |
Max.Capacitance @1 KHz | NA | |
DC Resistance per Cond. | ||
Insulation Colors | Black, Red | |
Overall Construction | ||
Jacket Type | UV-PE | |
Jacket Color | Siamese-Black | |
Nom.O.D. | 5.4mm × 5.0mm | |
Mechanical Properties | ||
Max.Recommended Pull Tension | 15 KGS | |
Min. Bend Radius(Install) | 86mm |


Company Introduction
Packing:
Production line:
FAQ
Q1. ARE YOU TRADING COMPANY OR MANUFACTURER?
A: We are factory.
Q2. HOW LONG IS YOUR DELIVERY TIME?
A:Generally it is 5-10 days, or it is 20-30 days if the goods are not in stock,its is according to quantity.
Q3. DO YOU HAVE ANY MOQ LIMIT FOR ORDER?
A: Normally, 10kms per one specification and one color
Q4. DO YOU PROVIDE SAMPLES? IS IT FREE OR EXTRA?
Q4. DO YOU PROVIDE SAMPLES? IS IT FREE OR EXTRA?
A: Yes,we welcome sample order to test and check quality.we could offer the sample for free charge but do not pay freight.
Q5. HOW TO PROCEED AN ORDER FOR CABLES?
A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms the samples and places deposit for formal order.
Fourthly We arrange the production.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms the samples and places deposit for formal order.
Fourthly We arrange the production.